Chardon High School needed a total roof replacement. Usually a project of this size is bid out in sections over multiple years: Not this one. Warren Roofing® had the summer of 2021 and 2022 to complete the work but due to supply chain issues we could not start the roof until the summer of 2022. A total of 100,300-square feet of roofing would need to be replaced within a 12-week window for the school’s summer break.

Request A Quote

The Job

Complete Roof Replacement

With four crews and lots of material deliveries, we were able to replace the entirety of the existing roofing system. Not one material delivery went directly to the job site. Warren Roofing® inventoried all material and delivered the material to the school on our own trucks. No other contractors could commit to such a task.

The Challenge

Quality on a Strict Timeline

This project uniquely required the work of multiple foreman and, at times, had up to four crews working side-by-side. Due to the supply chain issues and lead times ranging from 2-6 months, these crews had to pay close attention to what material they had and be proactive—one miscalculation and the project would not finish in time. To complete the job on time with the highest regard to craftsmanship and quality, the commitment of each team member was critical.

The Team

Commercial Roofing Crew

John Vetrovksy

Project Manager: John Vetrovsky

The Crew: Up to 25 workers on site at a time

The Status: Completed in August 2023

 

The Process

Teamwork and Collaboration

Warren Roofing® and Adam Bradley worked together through numerous unknown issues and challenges throughout the project. For example, the school had additions built onto the original structure numerous times over the years as Chardon grew. Over the course of the project, almost every transition needed to be redesigned.

With over 25 workers on site at a time, attention to safety on this job was even more important. At times, there were more than 2,000 feet of safety barricades in place.

The Results

A Job Well Done—and On Time

Chardon Schools is very satisfied with the completed work. Warren Roofing® was the only contractor with the capacity to finish a project of this size during the school’s summer break.