A Step-by-Step Approach to Successful Installation
This project required careful planning and execution due to the complexity of the design and the multiple roof areas. The process began with the installation of a torch-applied modified bitumen temporary roof to safeguard the structure during the construction phase. Next, a customized insulation package was applied, ensuring energy efficiency while providing a stable foundation for the final roofing system. The TPO membrane was then installed using a fully adhered, heat-welded process, creating a seamless, waterproof finish. In collaboration with the project designers, our team developed and implemented roofing details that met both aesthetic and functional requirements. After installation, thorough inspections were conducted to ensure that all roofing components adhered to industry standards and client specifications.
Throughout the process, Warren Roofing® maintained close coordination with AM Higley and other on-site contractors to ensure a smooth workflow and timely project completion. This included developing tailored solutions to meet the specific design needs of the aquatic center’s roofing system.